September 9, 2026


Members present at the meeting were Wayne Ross, John White, Len

Jatowski, Garry Warren, and Betty Westbrook.


Road Base and Culverts


1. There are currently 28 loads of road base in the current 2026

budget. After much discussion it was agreed that approximately

4-5 loads would be installed on Cedar Ridge at and above the

Canyon intersection, approximately 7 loads on Big Bear at the

Medano Intersection and from Victoria lane to California Circle, 1-

2 loads on Mill Run above Hampton Run, 8 Loads on Lower Mill

Run and the remaining 6 loads at the entrance gate, on the exit

road and north on Hampton Run from Lake of the Falls. At this

time no new culverts are being proposed.

2. Grading will only be done primarily on Lake of the Falls and Mill

Run and will be expanded if we receive substantial moisture. It

was also suggested to grade mill Run up to the Dan Curtis

driveway.


Road Improvements and Water Crossings

After discussion with James Cooley, our contractor, road

improvements will be completed on Cedar Ridge and Big Bear

prior to installing road base. We will continue to improve Big Bear

below Hampton Run if we receive adequate moisture. We also

discussed reducing the runoff across Mill Run near the service


road. John brought up the idea of installing a berm on the service

road above Mill Run to direct the water back to South Zapata

Creek. This was discussed with James Cooley, and he agreed with

the substantial fill that we have along Mill Run. We may also

deepen the ditch on the east side of Mill Run to prevent water

crossing the road south of the service road. We also discussed

using Len’s rock picker on a portion of Mill Run and Indian Hll.


Security Systems/Signs

Cameras have been installed and we need to purchase and install

Starlink to provide Wi-Fi service to designated computers.

Procedures need to be developed by governance for access and

monitoring of the security system data.

Purchase more gabion panels for road signs and there may be

other fencing material available for such signs.


Other Items

Finish split rail entrance fence

There was much discussion about speeding issues on the

subdivision. Speed Bumps will be installed after the Fall grading

near LOF and lower Cottonwood Loop as a test. Other areas to

consider are Lake of the Falls above Hampton Run, Hampton and

lower Mill Run . There was also discussion about renting or

borrowing a flashing sign indication speed.

Cut down and clean up dead cottonwoods by roll off and around

the exit road.

Push up wood recovery lot


2027 Budget

The 2027 budget was reviewed with 40 loads of road base and

reduced grading and rolling. The road base could be expanded in

the final budget if a breakeven net income could be achieved. As

a result, the road base budget was expanded to 50 loads.

1 Comment


mestantom
Oct 28

At September 2025 meeting it was determined to put 2(Two) speed bumps on LOF not one. One at Valynn's and one above Hampton Run. 2 not 1.